Skip to main content
ElectraCore
LearnCalculatorsCircuit DesignerReferences
Saved
Educational use: ElectraCore supports learning and preliminary checks. It does not replace a competent electrician or engineer. Verify results, equipment data, and current local regulations before installation or live work.
Courses/Domestic Wiring/Earthing & Bonding

lesson · 8min · Lesson 19 of 39

Supplementary bonding requirements

Course syllabusCourse overview
01Consumer Unit Design
  1. ReadConsumer unit layout and components
  2. ReadMCBs: types, ratings, and selection
  3. ReadRCDs vs RCBOs: when to use which
  4. ReadSplit load vs dual RCD boards
  5. quizModule quiz
02Ring Final Circuits
  1. ReadHow ring circuits work: the topology
  2. ReadCable selection for ring finals
  3. ReadSpur outlets: fused and unfused
  4. ReadRadial circuits: when to use them
  5. exerciseWiring practice problems
03Lighting Circuits
  1. ReadJunction box vs loop-in wiring methods
  2. ReadOne-way switching: full diagram
  3. ReadTwo-way switching: staircase wiring
  4. ReadIntermediate switching for long runs
  5. ReadDimmer circuits and LED compatibility
  6. quizLighting circuit quiz
04Earthing & Bonding
  1. ReadTypes of earthing: TN-S, TN-C-S, TT
  2. ReadMain protective bonding
  3. ReadSupplementary bonding requirements
  4. ReadEarth electrode installation for TT
  5. quizBonding quiz
05Special Locations
  1. ReadBathroom zones: Zone 0, 1, 2
  2. ReadKitchen wiring requirements
  3. ReadGarage and outbuilding circuits
  4. ReadGarden power: outdoor sockets and lighting
06Cables & Containment
  1. ReadTwin-and-earth cable construction
  2. ReadInstalling in walls: notching and chasing
  3. ReadTrunking, conduit and dado systems
  4. ReadCable in ceilings and floor voids
  5. quizDepths and zones quiz
07Fault Finding
  1. ReadSystematic fault finding process
  2. ReadOpen circuits: symptoms and finding them
  3. ReadShort circuits and cross-connections
  4. ReadRCD nuisance tripping
  5. exerciseFault finding case studies
08Wiring Regulations
  1. ReadBS 7671 structure and using the regs
  2. ReadNotification, certification and sign-off
  3. ReadPart P and building control
  4. quizFinal assessment
Lesson · 8min
EARTHING · TN-C-S (PME) vs TTTN-C-SsourceLPENMET (split N/PE)TTLNinstallation electrode; verify ADS and RCD requirements
Lesson contents 0%

In this lesson

PurposeCore theoryWorked exampleKnowledge checkSources

In this lesson

PurposeCore theoryWorked exampleKnowledge checkSources
0% read
ElectraCore lesson handout

Supplementary bonding requirements

Domestic Wiring · Lesson 19 · Beginner

BeginnerReview: professional review pending

Purpose

Decide whether supplementary protective bonding is required from the protective measures and measured conditions, not from room name alone.

Before you beginMain protective bonding · Automatic disconnection

Learning objectives

  • Define supplementary bonding
  • Distinguish it from main bonding
  • Recognise conditions for omission
  • Use measured evidence and current rules

Supplementary bonding locally connects simultaneously accessible conductive parts when needed to reduce touch voltage. Modern RCD and ADS arrangements can change whether it is required, but omission must be justified.

EARTHING AND BONDING PATHSEARTHING AND BONDING PATHSMETisolate · protect · identifydevice / pointtrace every conductor path

Core theory

Supplementary bonding connects relevant exposed-conductive-parts and extraneous-conductive-parts within a location; it does not replace the installation earthing conductor or main bonding.

For locations such as bathrooms, current requirements may permit omission only when specified conditions for ADS, RCD protection, and effective main protective bonding are satisfied.

Continuity and resistance evidence, actual accessibility, equipment class, circuit protection, and the current edition determine the result; a historic rule of bonding every pipe is unsafe oversimplification.

Terms, symbols, and units
TermMeaningSymbolUnit
Supplementary bondingLocal protective equipotential bondingNot applicableNot applicable
Simultaneously accessibleParts a person can contact at the same timeNot applicableNot applicable
ADSAutomatic disconnection of supplyNot applicableNot applicable
Worked exampleA bathroom has RCD-protected circuits and documented main bonding. Can supplementary bonding be omitted from that statement alone?

Assumptions: No inspection or measurements supplied.

  1. Conditions: RCD presence and main bonding are relevant but not the complete evidence set.
  2. Verify: Confirm ADS, protective-conductor continuity, relevant parts, and every current regulatory condition.
  3. Record: Only a competent assessment can justify omission.

No; all current omission conditions and measured evidence must be verified.

Reasonableness check: One protective measure does not prove the performance of the others.

Common mistakes
  • Bonding pipes to each other without the protective network
  • Assuming 30 mA RCD always removes the need
  • Confusing supplementary with main bonding

Where this appears in practice

The decision arises in bathrooms, plant spaces, alterations, and periodic inspection.

SafetyUnnecessary disconnection or unjustified omission can create hazardous touch voltages. Assess with the supply isolated where required and use suitable test procedures.
Local code checkThis lesson uses UK earthing and bonding terminology. Confirm the actual supply arrangement with the DNO where required and verify current BS 7671 Amendment 4 requirements, BS 7430 guidance, manufacturer data, and local Building Regulations with a competent designer.

Knowledge check

Does supplementary bonding replace main protective bonding?

No. They address different scopes and both depend on the protective design.

Answer: No. They address different scopes and both depend on the protective design.

Practical exercise

Create an evidence checklist for a bathroom supplementary-bonding assessment without declaring a site compliant.

Summary

  • Supplementary bonding is local
  • Omission is conditional
  • Measured evidence and current rules decide

Sources and review

  • Earthing and Bonding FAQs: IET; Current online guidance; United Kingdom
  • Earthing and bonding: Electrical Safety First; Current safety guidance; United Kingdom
  • BS 7671 Amendment 4 pocket guide: Electrical Safety First; 2026; United Kingdom

Editorial review date: 2026-08-21. Professional electrical review is pending.

Educational material for learning and preliminary checks. Verify current local requirements and exact equipment instructions. This lesson does not replace competent professional work.

Personal study record

Lesson notes

Ready

Notes are stored on this device unless you export them.