Skip to main content
ElectraCore
LearnCalculatorsCircuit DesignerReferences
Saved
Educational use: ElectraCore supports learning and preliminary checks. It does not replace a competent electrician or engineer. Verify results, equipment data, and current local regulations before installation or live work.
Courses/Solar PV & Renewables/Grid Connection

lesson · 8min · Lesson 22 of 29

G99: larger systems, DNO approval

Course syllabusCourse overview
01PV Physics & Panel Technology
  1. ReadPhotovoltaic effect: how a cell works
  2. ReadMonocrystalline vs polycrystalline vs thin-film
  3. ReadPanel specifications: Voc, Vmp, Isc, Imp
  4. ReadTemperature and irradiance effects
  5. quizPV physics quiz
02System Design & Sizing
  1. ReadSite survey: roof orientation, shading, pitch
  2. ReadString sizing: voltage and current matching
  3. ReadSeries vs parallel string configurations
  4. ReadYield estimation: kWh/kWp calculations
  5. exerciseSystem sizing design exercise
03Inverters
  1. ReadString inverters: topology and MPPT
  2. ReadMicroinverters and power optimisers
  3. ReadHybrid inverters for battery systems
  4. ReadInverter selection criteria
  5. quizInverter quiz
04Battery Storage
  1. ReadBattery chemistries: LFP vs NMC
  2. ReadBattery sizing for self-consumption
  3. ReadAC vs DC coupled systems
  4. ReadBattery safety and installation requirements
  5. exerciseBattery sizing exercise
05Grid Connection
  1. ReadG98: systems up to 3.68kW per phase
  2. ReadG99: larger systems, DNO approval
  3. ReadExport limitation and smart export tariffs
  4. ReadGeneration and export metering
  5. quizGrid connection quiz
06Installation & Commissioning
  1. ReadRoof mounting systems: rail and clamp
  2. ReadDC cable sizing and routing
  3. ReadCommissioning and functional testing
  4. quizFinal assessment
Lesson · 8min
Lesson contents 0%

In this lesson

PurposeCore theoryWorked exampleKnowledge checkSources

In this lesson

PurposeCore theoryWorked exampleKnowledge checkSources
0% read
ElectraCore lesson handout

G99: larger systems, DNO approval

Solar Pv · Lesson 22 · Advanced

AdvancedReview: professional review pending

Purpose

Plan a G99 connection before parallel energisation when the generating plant is outside the applicable G98 route.

Before you beginPV array and inverter design · Protection, isolation and testing fundamentals

Learning objectives

  • Identify the governing boundary
  • Trace energy and measurement paths
  • Apply evidence in the required sequence
  • Recognise unsafe assumptions

G99 governs the connection of generation within its scope and uses categories and evidence proportionate to plant capability and network impact. Application, studies, settings, type-test evidence and commissioning obligations depend on the exact project.

GRID CONNECTION AND EXPORT CONTROLGRID CONNECTION AND EXPORT CONTROLMODULEMPPTcold Voc · hot Vmpirradiance · temperature · shading · exact product limits

Core theory

Apply to the DNO and obtain the required permission before connecting in parallel; never treat successful bench operation as authority to energise the network.

Establish Type A/B/C/D classification, registered capacity, voltage level, protection, fault contribution, reactive-power and grid-support requirements from the current issue.

Record approved settings, interface protection, on-site tests, witness requirements, commissioning declarations and any operating/export constraints.

Terms, symbols, and units
TermMeaningSymbolUnit
G99ENA recommendation for connecting generation within its stated scopeNot applicableNot applicable
Interface protectionProtection coordinating generator disconnection with network conditionsNot applicableNot applicable
Witness testCommissioning test observed or accepted under the DNO processNot applicableNot applicable
Worked exampleA project exceeds the available G98 route but the inverter has a G99 type-test record. May it be connected before approval?

Assumptions: Values are supplied design inputs, not universal limits; Current DNO and product evidence will be checked.

  1. Classify: Determine the current G99 category and site requirements.
  2. Apply: Submit exact plant, protection and study information to the DNO.
  3. Connect: Parallel energisation occurs only after the required permission and commissioning steps.

No. A type-test record is evidence within the process, not connection permission.

Reasonableness check: The conclusion follows the connection point, aggregate plant and declared equipment rather than a marketing label.

Common mistakes
  • Treating 3.68 kW as a timeless universal threshold
  • Assessing each inverter separately instead of aggregate behavior at the connection point
  • Confusing a portal reading with settlement-grade metering

Where this appears in practice

A complete PV installation coordinates mechanical support, DC design, network permission, export control, metering, inspection, testing and handover.

SafetyIlluminated PV remains energized after AC isolation. Use the documented isolation, proving, connector, roof-access and test procedure; never disconnect loaded DC connectors or short a string casually.
Local code checkConfirm the current issues/amendments of G98, G99 and G100, the exact Connect Direct type-test record, the relevant DNO process and permission, current BS 7671 Section 712, MCS requirements where applicable, IEC 62446-1, manufacturer instructions, structural/fire design and metering/tariff rules. Network permission, electrical compliance, export payment and product monitoring are separate evidence streams.

Knowledge check

Does a G99 type-test record by itself authorize parallel operation?

No. The site-specific DNO application, approval and commissioning obligations remain.

Answer: No. The site-specific DNO application, approval and commissioning obligations remain.

Practical exercise

Create a document register for a fictional G99 project from application through final commissioning declaration.

Summary

  • Use the current rule and exact product record
  • Assess the whole installation at the connection point
  • Commissioning evidence is broader than successful generation

Sources and review

  • Engineering Recommendation G98: Energy Networks Association; Current issue and amendment must be confirmed; Great Britain
  • Engineering Recommendations G99 and G100 / Type Test Register guidance: Energy Networks Association; Current issue and Connect Direct status must be confirmed; Great Britain
  • IEC 62446-1:2016: PV systems: documentation, commissioning tests and inspection: IEC; 2016 + AMD1:2018; International
  • Health and safety in roof work (HSG33): HSE; Fifth edition; Great Britain

Editorial review date: 2026-08-22. Professional electrical review is pending.

Educational material for learning and preliminary checks. Verify current local requirements and exact equipment instructions. This lesson does not replace competent professional work.

Personal study record

Lesson notes

Ready

Notes are stored on this device unless you export them.